Future-automation UBL Manuale Utente Pagina 10

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 14
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 9
Installation: Stage 5
EBF - End Bed Flap
Page 9 of 12 // email [email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
Fixing the Flap
Offer the flap into position through the bed end void and fix
through the flap mount brackets on both side.
Try to keep the gap around the flap equal all the way round
and the minimum gap should be 3mm [0.1”].
Fix through the flap mount brackets slots first for adjustment.
Once happy with the position use the counter sink holes.
Vedere la pagina 9
1 2 ... 5 6 7 8 9 10 11 12 13 14

Commenti su questo manuale

Nessun commento